Augusta tomorrow, inc. History narrative



Download 110.09 Kb.
Page1/3
Date10.08.2017
Size110.09 Kb.
#31006
  1   2   3
AUGUSTA TOMORROW, INC.

HISTORY NARRATIVE

(FROM PRE-HISTORY IN THE 1800s to PRESENT DAY)
Many thanks to those who helped develop and proof this narrative, most especially Monty Osteen, Hugh Connolly, Dr. Lee Ann Caldwell and Camille Price.
Pre-Augusta Tomorrow
Augusta’s present downtown revitalization effort is one of many in the City’s long history. A notable earlier example was the response to the City’s economic slump in the 1830s. The solution – vastly successful – was the creation of the Augusta Canal system, built in 1845 and enlarged in 1875, which drew manufacturing such as saw mills, grist mills, textile mills (the big industry in Augusta until World War II) and ironworks factories to this new and substantial source of power generation in Augusta - water. Other efforts were launched over the years with varying degrees of success.
FOOTNOTE: Downtown is a term used primarily in North America to refer to a city’s center/core/or central business district (usually in a geographical, commercial, and community sense). By the early 1900s, the term was gradually adopted by cities across the United States to refer to the historical core and commercial heart of the city.
1872: The Augusta Cotton Exchange was organized.
1886: The Augusta Cotton Exchange building, modeled after the cotton exchange in New York City, was built and served as the headquarters of Augusta’s bustling cotton trade.
1899: The “Rivers and Harbors Appropriation Act of 1899” put into law the construction, repair and preservation of certain public works on rivers and harbors. Section 14 of that Act made it unlawful to “build upon, alter, deface, destroy, move, injure, obstruct…” any “sea wall, bulkhead, jetty, dike, levee, wharf, pier, or other work built by the United States...”
1908-1916: Construction of the Augusta levee started in 1908 and was completed between 1914-1916 as a federally authorized urban flood protection project.
1930s: The New Deal funded projects in Augusta through the Works Project Administration (WPA) program. Some of these projects included Augusta Canal repair, paving of Wrightsboro Road and Walton Way, building the Olmstead Homes and Sunset Homes (Augusta’s first public housing projects), and the Bell Auditorium on Telfair Street. The Bell Auditorium was constructed with $170,000 supplied by the WPA and $200,000 from a bond issue.
1938: In early attempts to provide a direct highway link between Augusta and Savannah, federal and state agencies conducted a study which officials hoped would lead to the development of a roadway to be called the Oglethorpe Trail. This roadway would roughly parallel the Savannah River and be a scenic highway link between the two cities. Groups from Augusta and Savannah formed the Oglethorpe National Trail and Parkway Association. The association successfully petitioned Congress to fund a $25,000 study of the project through the National Park Service. However, after the study approval, but before work was started, the project was halted by World War II.
1939: Augusta won a bid for an army camp as World War II commenced. Mr. Lester Moody, manager of the Augusta Metro Chamber of Commerce, was an important voice along with local politicians in spearheading the bid in Washington, D.C. Augusta was promised an air base as well as a major army installation.
9/1940: U.S. Government assigned 2000 men and 100 planes to Daniel Field.
1941: The Augusta levee was raised in height to 30 feet pursuant to the Flood Control Act of 1936.
6/30/1941: A resolution adopted by the combined governments of the City of Augusta and Richmond County obligated the governments to operate and maintain the levee.
1942: An army camp was constructed on Tobacco Road. In September 1942, the camp became known as Camp Gordon and, in October 1942, the “Rolling Fourth” division arrived. At the New Savannah end of Tobacco Road an airfield for the training of army pilots was constructed and given the name of an instructor, Donald C. Bush, who was killed in a training crash.
1950s: The automobile accompanied by an era of cheap energy brought immense change to the downtown. Mobility led to migration to the suburbs. Stores followed the automobile. Daniel Village and Southgate Plaza opened in the west and south suburbs.
1953: The increasing importance of the automobile was illustrated by the Gordon Highway controversy. State and federal authorities decided that a new highway, Gordon Highway, should cross Augusta between 4th and 5th Streets. That was the very oldest part of Augusta, part of Oglethorpe’s original forty lots. After much contention, a vote approving this new highway location was held in October 1955.
3/21/1956: Upon receiving permanent status, Camp Gordon was renamed Fort Gordon.
1960s – 1971: Interstate superhighway I-20 was built from Texas to South Carolina, making it an important East/West highway. Once built, restaurants and hotels moved to the intersections of I-20 and away from downtown Augusta.
1965: The Federal Department of Transportation made another attempt to build a roadway between Augusta and Savannah to bring tourists to both cities. It was to be called the Oglethorpe Trail roadway and would have been part of a nationwide program of scenic roads and parkways. Although designed as a north-south connector paralleling the Savannah River, it never was built.
1965: After the loss of several important historic structures in the 1950s, concerned citizens chartered Historic Augusta, Inc. for the purpose of preserving Augusta’s historical architectural heritage.
7/18/1968: A Central Business District Study Committee adopted a $54 million three-stage revitalization plan to transform downtown Augusta into “a city unique to the nation.” This plan proposed developing a new civic auditorium, a river convention center, a monument mall on the 500 block of Broad Street, a cultural center along the levee, waterfront housing and a waterfront park. By December 1969, the Central Business District Study Committee had only one member, and none of the 1968 plans were implemented.
1973: A revitalization effort occurred to try and stem downtown deterioration as more and more residents, retail and revenue moved to the suburbs. Like cities elsewhere, Augusta was feeling the impact of mid-century access to automobiles that made open-spaced suburbs very accessible. In November 1973, seventeen civic leaders including then Mayor Lewis A. Newman agreed to organize revitalization efforts. State Senator Eugene Holley made the first financial pledge for this new Revitalization Plan. A special tax district was created in the revitalization area to generate $1 million from the private sector to be matched with $1 million in Federal revenue-sharing money pledged by local government. The proposed plan and model for the city’s new downtown were unveiled in September 1974. The proposal encompassed 17 acres, and was funded in part by the $2 million. Three goals were outlined for this plan:

  1. To improve traffic circulation – for people and vehicles.

  2. To provide efficient & convenient downtown parking.

  3. To create an exciting physical environment.

4/1974: Internationally known architect I. M. Pei was hired by persons interested in the revitalization of downtown and spearheaded by the Downtown Council of the Greater Augusta Chamber of Commerce. Pei’s $40,000 contract called for a development program to bridge the 1968 revitalization study. Pei concentrated on parking and beautification of downtown Augusta.


9/17/1974: Pei’s $4 million proposed plan was announced to community leaders and interested citizens. Highlights of the plan were:

  • The Chamber of Commerce Building – Dubbed by Pei “The Chamber Pavilion” to be a gateway into downtown and was aligned with the Coliseum/Civic Center also under design by the Pei architectural firm of Pei, Cobb, Freed & Partners Architects, LLP.

  • Bicentennial Park – This half-acre park, located in the median of Broad Street in the 700 block, was Broad Street’s first green space.

  • Retail Pavilions – 8th Street to 10th Street – Retail pavilions were planned for the center of these blocks, with each building consisting of modules similar to the Chamber of Commerce Pavilion. Their flexible design would allow space for retail, restaurants, cafes, small boutiques and specialty shops.

  • Parking – 6th Street to 10th Street – Unique parking was proposed in these blocks to help define Augusta’s 168 foot-wide Broad Street – one of North America’s widest streets. Noting that its width is “exceptional and unique,” architect Pei observed: “It is not at all like other downtown main streets that have been closed and made into malls. Broad Street must continue as a street for cars, but at the same time it should provide the festivity, excitement and environmental amenity which a mall affords. Clearly the solution, like the street itself, must be unique.” The parking plan included:

  • Changing traffic lanes from three to two on Broad Street from 6th Street to 10th Street and adding parallel parking.

  • A new two-level parking deck on Ellis Street at 9th Street.

  • An innovative system developed by Travers Associates, the project’s traffic consultants. The system utilized a modification of “paired parking,” in which a short no-parking area between two spaces would enable in-out movement with no on-street maneuvering.

  • Parking within the median zone would be depressed. Low planting boxes would conceal cars and parking meters from sidewalk view.

The landscape architectural firm of Roger W. Davis & Associates and Holroyd and Johnson, Architects, both of Augusta, Georgia joined Pei to develop the landscape plan and detailed design of the project block by block moving west up the median of Broad Street from 6th Street to 10th Street.


1975: City of Augusta funded and appointed a Downtown Revitalization Commission, headed by David T. Peet, who had been chairman of the Chamber’s Downtown Council.
8/1975: Groundbreaking for the 1974 revitalization plan began and included building the Chamber of Commerce structure and associated depressed parking in the 600 to 700 blocks of Broad Street.
1976: Chamber of Commerce moved into the new Pei modular structure it built in the center median of the 600 block of Broad Street.
1977: Another attempt was made to build a road from Augusta to Savannah. Thomas F. Allgood, Bill English and Charles Wessels authored a resolution in the Georgia Senate seeking a Department of Transportation study of the traffic corridor between Augusta and Savannah. After some study, the project was shelved.
7/27/1978: Regency Mall opened. It was located at 1700 Gordon Highway. At the time, it was the largest self-enclosed climate-controlled mall in Georgia, costing $25 million.
8/3/1978: Augusta Mall, built by the Rouse Company opened at 3450 Wrightsboro Road.
Although slowly declining since the early 1970s, downtown Augusta had remained the retail, cultural, banking, professional and social heart of the Augusta urban area. All of that dramatically changed after the opening of Regency Mall and Augusta Mall within a week of each other in 1978. With an excess of two million square feet of retail space between them and over 3000 jobs pulled from Augusta’s downtown, the impact to downtown Augusta hit fairly suddenly with the debilitating effect of both major and smaller retailers and related services moving to or near the mall locations. Boarded-up storefronts and vacant buildings soon dominated the downtown shopping area.
The consequences to downtown Augusta were, as with other cities before it, predictable: declines in property values and in the City’s tax base, in patronage of those merchants and other businesses that remained downtown, and a markedly decreased utilization of property and existing infrastructure (infrastructure built and maintained by the City such as streets and sewers, and utilities maintained by electrical, gas and telephone companies). Overall, a significant reduction in activity was accompanied by a growing deterioration not only in property use but in civic attitude and hope for the future of downtown Augusta.
The malls and suburban growth phenomenon, while certainly not unique to Augusta, nevertheless occurred comparatively late in Augusta compared to the rest of the United States. The first mall opened in 1952 in Michigan. However, when it happened, the consequences to the central city were comparable to those experienced by other American cities in the years between the end of World War II and the mid-1950s.
12/1979: Augusta Civic Center, designed by Pei, opened its doors.
Augusta Tomorrow’s History
1980: Augusta business leaders H. Monty Osteen, Jr., president of Bankers First (formerly First Federal & Loan Association) and D. Hugh Connolly, president of Sherman & Hemstreet Realtors were both concerned about the deterioration of downtown Augusta and whether a downtown was really necessary for the long-term economic viability of a city like Augusta. These two gentlemen became the nucleus of the Augusta Tomorrow organization. They spoke with other businessmen who were also concerned about downtown’s deterioration. The following questions were asked of local and national economists and urban experts:

  1. Was it important for the community to have a viable central city, a traditional downtown, from an economic standpoint? Was the problem of decline as great as what was thought and what should be done with abandoned buildings? From conversations with urban experts and economists throughout the country, it became clear that it was critical to the well-being of the city to have an economically vibrant downtown. A deteriorated economically declining downtown served only to contaminate the rest of the community in economic, aesthetic and psychological terms. The community is best served when it is healthy throughout.

  2. Would the historic preservation efforts and Historic Augusta alone achieve the degree of revitalization necessary to reverse the central city’s decline effectively and lastingly? The answer was “no;” complex issues were involved which had to be dealt with through the application of manifold resources, public and private, focused directly on the various causes of the problem, even though preservation and restoration would remain an important part of the process.

Early 1980s: During a realty conference in Savannah, Georgia, Connolly had a chance meeting with George M. Brady, Jr., a member of The Rouse Company’s board of directors. Brady suggested to Connolly a meeting with Leo Molinero to discuss Augusta’s potential for revitalization. Molinero was president of American City Corporation of Columbia, Maryland and a wholly-owned subsidiary of The Rouse Company.


1981: Downtown revitalization was a major issue in the mayoral campaign. At least three candidates had revitalization planks in their platforms including Edward McIntyre. The candidates understood that Augusta needed a mayor and city leadership who embraced downtown revitalization. McIntyre was subsequently elected Mayor of Augusta.
The group of businessmen concerned with downtown Augusta's deterioration had met with all the mayoral candidates prior to the election, paving the way for cooperation following the election.

1/4/1982: Edward M. McIntyre assumed the position of Mayor of Augusta. He responded favorably and enthusiastically to the recommendation of Augusta Tomorrow’s founders, still an ad hoc group of private interests, that it was time to begin downtown revitalization efforts and explore possible ways to create revitalization pathways.


1/15/1982: Molinero advised McIntyre, Connolly and Osteen that the most probable combination to ensure success was a public/private partnership. It would take private enterprise and know-how along with municipal government backing to get an effective program, of the magnitude imagined, implemented. The private portion of that relationship was the “ad hoc” group of prominent business and professional leaders eventually known as Augusta Tomorrow.
3/22/1982: The City of Augusta partnered with “Augusta Tomorrow” (then still a group of community leaders) and commissioned the American City Corporation, to conduct a six-month study of the entire downtown area and the riverfront and produce a viable plan for its redevelopment. The $120,000 fee was paid ½ by the City of Augusta and ½ wholly by the individual members of Augusta Tomorrow.



  • American City’s contractual assignment was to study downtown Augusta and to recommend specific projects to be undertaken to turn the tide of deterioration.

  • Mr. Bert Winterbottom, Senior Development Director at The American City Corporation, coordinated the technical team that completed the six month study of downtown Augusta.

8/5/1982: Winterbottom recommended to McIntyre and the Augusta Tomorrow board that Augusta aggressively pursue a new north-south highway corridor connection between Augusta and Savannah.


9/22/1982: American City Corporation presented its $116 million plan, A Strategy for Downtown Development, to the City of Augusta and Augusta Tomorrow for downtown revitalization. The American City Corporation planners had studied all aspects of the city and found room for expansion and promotion of a medical complex, tourist attractions, historical sites and an economic base. But they also found problems – a downtown suffering from an image problem, little attempt to promote tourism, an inadequate effort to seek non-industrial businesses and too few convention facilities.
A Strategy for Downtown Development called for the implementation of some 41 projects with 20 first priority projects including development of office space, specialty retail and restaurant development, public space improvements, convention visitor/tourist attractions and parking accommodations Most notably, the plan called for public improvements on the riverfront in the form of a promenade/overlook, amphitheatre and marina development to focus attention on the city’s heretofore undeveloped and inaccessible Savannah River waterfront. The central business district was expanded to include Olde Town, the Medical area and Laney Walker neighborhood. In the Laney Walker neighborhood, recommendations included constructing a neighborhood commercial center on Laney Walker Blvd.
Two Conditions Precedent to Implementing the 1982 Master Plan

None of the initial master plan initiatives on the Savannah River could have happened without first satisfying two essential conditions - amending the federal 1899 Rivers and Harbors Act in order to breach the levee and removing the railroad tracks from the south side of the levee.


  1. Amending the Federal 1899 Rivers and Harbors Act

Augusta 10th District Congressman D. Douglas Barnard and U.S. Senators Mack Mattingly and Sam Nunn were instrumental in creating enabling legislation in Washington, D.C. that allowed the U.S. Congress to amend the 1899 Rivers and Harbors Act and to grant the Army Corps of Engineers the authority to allow a breach in the 30 foot high Savannah River levee in downtown Augusta.


  1. Railroad Track Relocation

The levee could not be breached with the train tracks in place that ran west along the levee from 6th Street. When the issue about removing the railroad tracks was broached, Connolly, Mr. Charles B. Presley, chairman of the board & CEO of Georgia Railroad Bank & Trust Company, Mr. Whitney C. O’Keeffe, President, First National Bank & Trust Company and City Council member Mr. Charles DeVaney went to Jacksonville, Florida to meet with the Vice President-Engineering and Maintenance for the Seaboard Coast Line Railway, Mr. A. C. Jones, Jr. The meeting was held 12/8/1982. While in Jacksonville, it was discovered that there were many personal connections between Jones and Augusta, and the negotiations took on a new personal bent.
Jones was very helpful in shifting the spur track from going west along the levee to east of 6th Street. Effective 1/1/1983, The Seaboard Coast Line Railroad became Seaboard System Railroad. On 6/7/1983, Jones signed a letter approving the track relocation. The train tracks were subsequently removed from the levee with track and train relocation in September 1985.
These two events enabled development of the Riverwalk. Overcoming these two major obstacles of penetrating the levee and removing the spur railway line paralleling the levee are examples of how a strong public/private partnership can overcome incredible odds.
11/5/1982: Augusta Tomorrow incorporated as a non-profit, public and private sector organization designed to act as a catalyst for downtown development.

Augusta Tomorrow membership originally consisted of 11 private sector business and professional firms and the City of Augusta represented by the Mayor and the Clerk of Council. The purpose of this organization was to bring the private and public sectors together in an effort to provide leadership and coordination for needed projects. Augusta Tomorrow was jointly funded by the City of Augusta and the private members. Except for special projects, 50% of the operating budget was funded by the City of Augusta and the remaining 50% was equally pro-rated among each of the Augusta Tomorrow board members.


The original board members invited by the founders Connolly and Osteen to become members of Augusta Tomorrow were:

Louis L. Battey, M.D.

D. Hugh Connolly – President, Sherman & Hemstreet, Inc.

James H. Hamilton – President, The Citizens and Southern National Bank

William B. Kuhlke, Jr. – President, Kuhlke Construction & Associates, Inc.

Bryce H. Newman – President, Merry Land & Investment Company, Inc.

Robert C. Norman – Partner, Hull, Towill, Norman & Barrett, P.C.

Whitney C. O’Keeffe – President, The First National Bank & Trust Company of Augusta

H. M. Osteen, Jr. – President, First Federal Savings & Loan Association of Georgia

Charles B. Presley – Chairman of the Board & CEO, Georgia Railroad Bank & Trust Company

B.W. Rainwater – Vice President, Georgia Power Company

Edward B. Skinner – General Manager, The Augusta Chronicle Herald


What does Augusta Tomorrow do? For some projects, Augusta Tomorrow acts as a discussion forum, in others Augusta Tomorrow becomes a cheerleader, in others Augusta Tomorrow provides leadership for fundraising efforts and still, in others Augusta Tomorrow serves as the day to day support team and developer. In some cases, Augusta Tomorrow members have served as both developers and investors in the same project (such as Riverfront Center).Through various initiatives, Augusta Tomorrow works to create and maintain an environment that is conducive to attracting development projects to the central city and also to serve as a catalyst for change within the context of downtown revitalization goals. In essence, Augusta Tomorrow was initially an ad hoc undertaking to meet a special and critical need of the city center for which no other organization existed or currently exists to cope with that need. Augusta Tomorrow’s members have, on occasion, taken leadership roles in the metro Chamber, Historic Augusta, the Downtown Development Authority and other organizations, working to promote a felicitous and productive combining of efforts.

The corporation worked because the directors were all equals. The officer positions rotated on every two years. Each member of the board had a financial stake in downtown revitalization both because of the future of their downtown businesses as well as their personal investment in Augusta Tomorrow, Inc.


When originally incorporated, Augusta Tomorrow had no staff. Therefore, the day-to-day administrative work of Augusta Tomorrow was conducted by Robert Zeyfang, the director of the Mayor’s Office of Economic Development.
11/10/1982: Organizational meeting of Augusta Tomorrow, Inc. Charter of Organization approved and officers elected.
12/8/1982: Key terms to rail abandonment occurred at meeting in Savannah with Jones at Seaboard Coast Line Railway Family Lines Railroad and representatives from Augusta Tomorrow (Connolly, O’Keeffe, and Pressley), DeVaney representing Augusta City Council and Winterbottom representing American Cities Corporation.

12/17/1982: The Georgia Department of Transportation officially approved removing the rails along the levee for the Seaboard Coast Line Railroad. The railroad had not yet agreed to remove the tracks.


12/20/1982: Augusta Tomorrow jointly with the City of Augusta signed a contract with American City Corporation to implement the $116 million revitalization effort for downtown Augusta. The contract retained American City Corporation on behalf of Augusta City Council and Augusta Tomorrow, Inc. for implementation of the first phase of projects called for by the Master Plan. The one-year contract fee of $240,000 was paid ½ by the City of Augusta and ½ by the members of Augusta Tomorrow, Inc. Initial efforts concentrated on riverfront improvements to capitalize on the river as an amenity for all kinds of development, e.g. retail, commercial, business. It was important to open the river as an attractive amenity for more development and to stimulate the local economy.
1982: Faced with the need to expand their corporate headquarters in 1982, Bankers First decided to meet that need downtown.
1/27/1983: Augusta Tomorrow board members (Louis Battey, MD, Connolly, O’Keefe and Skinner), representatives of Mayor McIntyre’s office and state Rep. Jack Connell along with Savannah business and political leaders met in Atlanta with the Georgia Department of Transportation Commissioner Tom Moreland to start discussions of a highway connecting Augusta and Savannah.
3/18/1983: The first step toward implementation of the 1982 long-range downtown Master Plan was announced by Bankers First Federal Savings and Loan with the sale and $1 million renovation of 791 and 793 Broad Street, part of the overall plan for the renovation of the entire Bankers First block that included the YMCA building. Augusta Tomorrow board members were the prominent promoters, investors and developers of this project initially called the Bankers First Project. The project was later named Lafayette Center.
3/31/1983: Augusta City Council voted to spend $848,000 in federal community development funds for riverfront improvements including land acquisition for an international golf exposition.
4/18/1983: City of Augusta adopted a formal ordinance that the Downtown Augusta Master Plan prepared for the City of Augusta and Augusta Tomorrow, Inc. by American City Corporation become the official development program for the downtown area of the City of Augusta.
4/20-21/1983: Augusta Tomorrow hosted the monthly meeting of the Georgia Department of Transportation in Augusta, the first one held in Augusta in nine years. One of the topics discussed was moving forward on a new Augusta to Savannah Highway.
6/7/1983: Seaboard System Railroad approved railroad track relocation away from the Savannah River levee.
8/6/1984: The City of Augusta executed an agreement with the Department of Natural Resources in the amount of $35,000 for the first phase development of the 1.2 acre Bay Street Esplanade Project (renamed Riverwalk Project) and the golf exhibition.
8/15/1984: Contractual relationship with American City Corporation terminated after several months of technical and professional consulting services to Augusta Tomorrow, Inc. and the City of Augusta advising on the organizational and administrative steps necessary to enable Augusta Tomorrow, Inc. to carry out the development program. On this transition date, Augusta Tomorrow, Inc. assumed full responsibility for the implementation work previously handled by American City Corporation. The initial contracts with American City Corporation were necessary and productive, but they were also expensive to maintain.
9/1/1984: Augusta Tomorrow, Inc. hired Dayton Sherrouse as Executive Director to provide administrative direction for Augusta Tomorrow, Inc.
10/15/1984: Augusta Tomorrow entered into an agreement with the City of Augusta to prepare and administer a Riverwalk feasibility study and plans for a golf exhibition. The $35,000 for this study was granted by the Office of the Governor and channeled to the City through the Department of Natural Resources of the State of Georgia.
10/18/1984: Augusta Tomorrow opened its own office with staff to continue implementation of downtown improvements. The office was open part-time for the remainder of the year and then fulltime thereafter. The office was located in the Trust Company Bank building and remained jointly funded by the eleven private members of Augusta Tomorrow and the City of Augusta.
11/5/1984-12/31/1984: City of Augusta formally contracted with Augusta Tomorrow, Inc. to assist in implementing the Downtown Development Plan. With this agreement, Augusta Tomorrow, Inc. agreed to: provide staff services (both administrative and clerical) for the Augusta Port Authority, to assist the City in implementing the Downtown Development Plan as prepared by the American City Corporation and assist in the preparation of financial packages and Urban Development Action Grant (UDAG) applications.
11/9/1984: A ceremony for the groundbreaking for Lafayette Center was held. At the groundbreaking federal HUD funding for this project was presented to the Mayor. Augusta Tomorrow board members were promoters, developers and investors in this master plan project. The project was called the Bankers First Project before being renamed Lafayette Center.
1/1/1985: Augusta Tomorrow office opened full-time. The office, under an agreement with the City of Augusta, provided administrative staff services for the Augusta Port Authority and in 1989 for the Augusta Canal Authority.
1/1985: Augusta Tomorrow, Inc. executed a contract for a Golf Augusta Conceptual Study with Cambridge Seven Associates from Cambridge, Massachusetts to study a golf tourism venue for downtown Augusta.
3/1985: The final design for the riverfront and levee was completed and hand delivered to the Army Corps of Engineers for review and approval. Improvements proposed ran from 6th Street to 300 feet west of 8th Street and included: breach at 8th Street, two bulkheads, a brick walkway (esplanade) on top of levee, an overlook, landscaping and lighting, interpretive plaques and construction of Oglethorpe Park at the 6th Street entrance. This park became a children’s playground and picnic area.
5/25/1985: Georgia Department of Natural Resources issued “Certification to the City of Augusta, an applicant for a Federal permit or license to construct an activity in, on or adjacent to the waters of the State of Georgia.” This was the State of Georgia’s certification for the breaching of the levee.
5/30/1985: Augusta Tomorrow, Inc. purchased the Cotton Exchange building from J. W. Porter to protect it from acquisition by unprincipled speculators or by those who might not direct its utilization toward involvement in downtown revitalization. The purchase and carrying expenses were borne solely by Augusta Tomorrow, Inc. members for the next three years.
6/1985: A memorandum of understanding was signed between City of Augusta and Seaboard System Railroad for abandonment of rail lines along the Savannah River levee.
8/13/1985: Connolly, then president of Augusta Tomorrow, Inc. urged action by Mayor Charles DeVaney regarding the Augusta Canal to “take steps that will work to the enhancement of this historic and otherwise valuable and unique local asset.”
8/14/1985: Eight riverfront acres from 3rd Street to 7th Street reverted back to city government control after two years and eight months of negotiations by the city, American City Corporation and Augusta Tomorrow with the private land owners. This ended a 60-year lease on the property which had 48 years remaining and forged the way to continued riverfront development.
9/15/1985: Seaboard System Railroad officially abandoned the railroad tracks along the levee.
10/1985: Cambridge Seven Associates completed the Golf Augusta Conceptual Study. The study report recommended: developing a Georgia Golf Hall of Fame museum and clubhouse, a hotel and conference center, golfing exhibits and video attractions in downtown Augusta. It should be noted that Cambridge Seven Associates recommended the project be placed at the Augusta Levee between 5th Street and 6th Street. When the actual building of this project began, the project was placed on the Augusta Levee between 12th Street and 13th Street due to land availability.
10/22/1985: Army Corps of Engineers sent a draft authorization to the City of Augusta for riverfront improvements. The levee still could not be breached until final signed authorization was received.
10/30/1985: Augusta Tomorrow members met with their counterparts in Savannah to seek active support of the proposed Augusta/Savannah highway.
11/5/1985: Mayor DeVaney announced that the U.S. Army Corps of Engineers officially approved a cut in the Augusta levee. The Corps’ approval allowed a cut or opening, in the levee, and the construction of docks, bulkheads, an esplanade, or walkway, atop the levee, and other amenities adjacent to the levee. “It literally took an act of Congress,” DeVaney said while displaying the yellow permit, which is scarcely bigger than an index card but required special legislation to be approved. Representative Doug Barnard initiated the legislation in the U.S. House of Representatives and Senators Mack Mattingly and Sam Nunn initiated the legislation in the U.S. Senate to allow the levee breach.
1985: Beginning in 1985, Bankers First Real Estate Development Corporation started assembling parcels of riverfront property that eventually comprised the large tract of land developed as the Augusta Riverfront Center. In addition to the assemblage of land parcels, the Project required substantial funding to proceed. The Augusta Riverfront Center project included the office building (later housing the Morris Museum of Art), the Marriott Conference Center (formerly Radisson), and Marriott Hotel & Suites (formerly Radisson), parking garage and surface parking (9th Street to 11th Street and Reynolds Street to the Augusta levee). Development of the Augusta Riverfront Center was accomplished only by the vision and determination of Bankers First Bank, Augusta Tomorrow, Inc. board members and the City of Augusta.
1986: Bankers First Bank with the City of Augusta investigated obtaining an Urban Development Action Grant (UDAG) from U.S. Housing and Urban Development (HUD) to help finance development of the Augusta Riverfront Center project.
1/21/1986: Augusta Tomorrow, Inc. held the dedication of the Lafayette Center, the name given to the restoration/renovation of the 900 block on Broad Street from 10th Street to McCartan Street. “When Lafayette visited Augusta in 1825, the city united in an incredible spirit of celebration. Our gala grand opening recalls that fun and memorable event. But more importantly, the revitalization signaled by Lafayette Center calls upon that historic Augusta spirit of unity and civic pride” said Osteen.
When the restoration project was finished, Bankers First anchored one end of the block at 10th and Broad Streets and the YMCA building (42,000 sq. ft. for corporate offices and 20,000 sq. ft. for a health club) anchored the other end of the block at McCartan and Broad Streets. In all, 5 historic buildings were totally remodeled including the oldest structure remaining on Broad Street.
Lafayette Center was the largest restoration project in the State of Georgia up to that point. The result was a $10 million historic rehabilitation project for downtown undertaken by Bankers First, a member of Augusta Tomorrow.
Due to the huge investment that they had made to renovate the Lafayette Center block in downtown Augusta, Bankers First was the recipient of a “Best Overall Project” award from

Download 110.09 Kb.

Share with your friends:
  1   2   3




The database is protected by copyright ©ua.originaldll.com 2024
send message

    Main page